Maritime & Ship Management

Aground

Aground describes a ship whose hull is resting on or stuck against the seabed (or a shoal, reef or bank) and is no longer freely afloat. Running aground (grounding) happens when a vessel enters water too shallow for its draft — through navigational error, losing control (going adrift), or being driven ashore by weather.

Grounding is a serious maritime casualty: it can cause hull damage, flooding, pollution, and loss of the ship, and refloating may require lightening the ship (removing cargo/ballast), tugs, salvage and favourable tides. A vessel aground must display the correct signals/lights under the COLREGs. Grounding risk is precisely why under-keel clearance, accurate charts, passage planning and pilotage matter so much, and why adequate draft management and channel depth are critical. (A deliberate, controlled grounding — beaching — is used by some craft like landing craft, or as an emergency measure.) Aground is a fundamental term of navigation safety, describing a ship that has met the bottom — one of the outcomes that safe navigation exists to prevent. It denotes a grounded, immobilised vessel.

Why it matters

Grounding is one of the classic ways ships come to grief — hull damage, flooding, pollution, even total loss — and it is exactly what under-keel clearance, charts, passage planning and pilotage exist to prevent. Understanding "aground" underscores why draft and channel depth are watched so closely in safe navigation.

Also known as
Run agroundGroundingStranded
Where this matters at WHIZTEC
Frequently asked
What causes a ship to run aground?

Entering water too shallow for its draft — through navigational error, loss of control, or being driven ashore by weather.

How is a grounded ship refloated?

Often by lightening it (removing cargo or ballast), tug assistance, salvage and using a rising tide.

More Maritime & Ship Management terms

Voyez WHIZ dans votre opération.

Un Architecte de Solutions adaptera une démonstration de 30 minutes à vos modules, intégrations et plan de déploiement. Sans engagement.